Ashtabula Project

May 30, 2006

The haul roads are sprayed with water to suppress dust when traveling on the unpaved roadways
The haul roads are sprayed with water to suppress dust when traveling on the unpaved roadways.
Two portable bridges are being used to ger the off-road equipment over three 24" underground water lines
Two portable bridges are being used to get the off-road equipment over three 24" underground water lines.
Large excavators are used to remove pieces of the former building foundation into an off-road truck. It is estimated that there is over 20,000 tons of concrete foundations that have to be removed prior to landfill excavation
Large excavators are used to remove pieces of the former building foundation into an off-road truck. It is estimated that there is over 20,000 tons of concrete foundations that have to be removed prior to landfill excavation.
One of the 150,000 lb. excavators that will be used for landfill excavation
One of the 150,000 lb. excavators that will be used for landfill excavation.
The double walled HDPE pipe that will be used to pump/transfer the dredges sediment from the river to the landfill
The double walled HDPE pipe that will be used to pump/transfer the dredged sediment from the river to the landfill.